Results 1 to 2 of 2

Hybrid View

  1. #1
    Player
    Silvantica's Avatar
    Join Date
    Dec 2013
    Posts
    6
    Character
    Van Silva
    World
    Ravana
    Main Class
    Bard Lv 57

    Broken Portrait (depending on job change order)

    Steps:
    1. Use three unique fashion plates and attach one to SMN one to RDM and one to BLM.
    2. Make sure they all are using the same gear.
    3. Link all to their own unique portraits.
    4. On one of the fashion plates use "Fat Cat LoungeWear" in the chest piece slot (You can't have an item in the hands slot - this is what causes the bug)
    5. Equip different fashion items into the hands slot on the remaining two fashion plates.

    Bug: Depending on the order in which you switch classes this will break the portrait for the job with the "Fat Cat LoungeWear" equipped. This will depend on which class you saved the portrait on. The hands have a fashion item but you can't alter it.
    for example I could switch from BLM -> SMN and the portrait worked but broke as soon as I switched from RDM -> SMN. SMN is wearing the item which doesn't allow hand items.

    Fix: Ideally just let people use the closed fashion plate slots, even though we can't see the item - there are other items which would cause this bug too, mostly Cash Shop items.
    (1)

  2. #2
    Player
    Silvantica's Avatar
    Join Date
    Dec 2013
    Posts
    6
    Character
    Van Silva
    World
    Ravana
    Main Class
    Bard Lv 57

    Example Pic

    (1)