Results -9 to 0 of 36

Threaded View

  1. #16
    Player
    ZephyrMenodora's Avatar
    Join Date
    Oct 2014
    Location
    Gridania
    Posts
    2,314
    Character
    Zephyr Menodora
    World
    Zalera
    Main Class
    White Mage Lv 100
    Quote Originally Posted by Jeeqbit View Post
    3.0-3.1: 20 weeks
    4.0-4.1: 16 weeks
    5.0-5.1: 17 weeks
    6.0-6.1: 18 weeks
    7.0-7.1: 19 weeks

    Overall it's the norm for what it has been through Endwalker, which is about 19-20 weeks. The only exception is really the timeframe between the last patch and the expansion, which between ShB-EW was 8 months and EW-DT was also about that much, up from the 5 months it used to be.
    Do you have this same info for the .1 to .2 patches?

    I see 7.1 was 11/12/2024, so we are at 15 and a half weeks so far. It's already feeling like a stretch...I probably log in only twice a week for less than an hour at this point.
    (1)
    Last edited by ZephyrMenodora; 02-28-2025 at 09:38 AM.