Quote Originally Posted by brinn12 View Post
This is wrong. 7.0 to 7.1 took longer than 6.0 to 6.1. Every expansion has been increasing the time between patches.
3.0-3.1: 20 weeks
4.0-4.1: 16 weeks
5.0-5.1: 17 weeks
6.0-6.1: 18 weeks
7.0-7.1: 19 weeks

Overall it's the norm for what it has been through Endwalker, which is about 19-20 weeks. The only exception is really the timeframe between the last patch and the expansion, which between ShB-EW was 8 months and EW-DT was also about that much, up from the 5 months it used to be.