Page 3 of 6 FirstFirst 1 2 3 4 5 ... LastLast
Results 21 to 30 of 51
  1. #21
    Player
    Limiloo's Avatar
    Join Date
    Jun 2016
    Posts
    26
    Character
    Xia Xue
    World
    Raiden
    Main Class
    Arcanist Lv 90
    Agree, I have a lot of playtime, and been affected every single day. Lost progress in dungeons, timed events etc. I believe we deserve some compensation. Thank joooo
    (4)
    \(= ` ●′=)/

  2. #22
    Player
    Zeastria's Avatar
    Join Date
    Jan 2023
    Location
    ¯\_(ツ)_/¯
    Posts
    507
    Character
    Nathaniel Lenox
    World
    Twintania
    Main Class
    Scholar Lv 100
    Though i have dc'ed daily for past 7 days, i was still able to play everyday!
    I dont want any compensation...
    I rather want them to spend that money/time to
    build better protection or ways to avoid ddos in future.
    (6)
    SCH/AST/DNC/VPR/SMN

  3. #23
    Player
    keichirou's Avatar
    Join Date
    Aug 2018
    Posts
    196
    Character
    Harunah Fae
    World
    Lamia
    Main Class
    Archer Lv 50
    Quote Originally Posted by Sjol View Post
    The ToS specifically protects them for failure to provide service. So if the do it it's because they feel they have to from a public relations viewpoint.
    stop using the ToS like some sort of shield , big corpos like Apple,Amazon and google,twitter, damn facebook have been subjects of lawsuits even when people agreed to their ToS , A ToS doesnt mean you completely forfeit your rights as a consumer
    (13)
    why is WoW living rent free inside your heads?

  4. #24
    Player
    sindriiisgaming's Avatar
    Join Date
    Jan 2023
    Location
    Gridania
    Posts
    1,430
    Character
    Sugar And'spice
    World
    Twintania
    Main Class
    Reaper Lv 100
    I don't want my money back. I want it fixed. And ASAP. Whatever it takes.
    (4)
    Quote Originally Posted by sindriiisgaming View Post
    your titanmen, hes titanmen IM TITANMEN are there anymore titanmens i should know about?

  5. #25
    Player
    CStrife912's Avatar
    Join Date
    Jul 2015
    Posts
    470
    Character
    Alexia Kusanagi
    World
    Odin
    Main Class
    Bard Lv 90
    For how much of the month it’s affected less then 1/4 if we count it and even that it’s not been all day but partial hours cause my friend has been experiencing it but still doing stuff so it hasn’t been crippling… it equates to like £1.50 here lol I’m not even going to remotely grumble on £1.50 which is the cost of a mayo chicken at McDonald’s almost lol if this was a month maybe I’d be more ok with asking for something but as it stands not really, stuff happens it is what it is… I just expect a brief comment during the live letter and that’s about it honestly. Technically the longer this goes on for the more ways they can find ways to plug it for future attacks so technically it’s a good thing at the same time lol
    (3)

  6. #26
    Player
    hunter2's Avatar
    Join Date
    Dec 2023
    Posts
    74
    Character
    Hoon Tahtoo
    World
    Ragnarok
    Main Class
    Monk Lv 100
    I've lost multiple nights of Criterion prog at this point. We load in, beat the first boss and then all get kicked out and lose our checkpoint, so no one in the group wants to even try until we know the DDOS is gone.

    I've heard from friends doing TOP in PF that it's similarly unplayable: it's a struggle to get 8 players all into the instance, and then someone disconnects during p4 and wipes the group, people get annoyed and leave, etc.
    (6)

  7. #27
    Player
    Rueby's Avatar
    Join Date
    Feb 2022
    Location
    Zenos' Pockets
    Posts
    872
    Character
    Vera Nova
    World
    Spriggan
    Main Class
    Gunbreaker Lv 90
    Refund? No chance it's going to happen.
    Free gametime? I think it could be a PR win.

    For me I'm annoyed by it, but I'm trying to keep it realistic, it's not something they can 'just fix it bro' for now, but free game time as compensation could generate some goodwill and keep people somewhat happy.

    I've been wanting to play PVP but pvp with lag/disconnects is awful. I have been putting off crafting as well...I definitely didn't feel comfortable doing rouls with frequent dcs going on. It's not severe but it is annoying. I hope I can get my series to 25 before DT drops, that's all.

    I also wanted to dip my toes in the unreal and catch up to some of EW's exs that I missed...things I don't think is going to be possible unless I know we're in the 'safe side'. So yes, people have been affected and it has been abit disruptive.
    (1)

  8. #28
    Player
    caffe_macchiato's Avatar
    Join Date
    Aug 2021
    Posts
    720
    Character
    Macchi Ato
    World
    Balmung
    Main Class
    White Mage Lv 93
    Many people in the English-speaking community don’t have an issue with what’s going on. One of the advertised benefits of Final Fantasy XIV is that it lets you play other games unlike WoW. So by going offline, the game is still giving you something by letting you play other games. Yoshi-sama cares about your personal health and wants you to touch grass. There’s been some complaints about not being able to complete raids, but you know this isn’t WoW, right? Yoshi-sama wants you to take a break and chill. That’s a good thing and that’s why so many players came to FFXIV during Shadowlands.

    Speaking of which, being DDoSed is perfectly normal. Many websites and games have it way worse and they never get free game time, like WoW. So why should FFXIV be any different? At least it’s a quality experience. After all, Meteion is nothing like the Jailer. So I think we should all be grateful of Yoshi-sama and Square Enix delivering such an outstanding game, they’re trying their best!
    (2)

  9. #29
    Player
    Morikyu's Avatar
    Join Date
    Jun 2019
    Location
    Gridania
    Posts
    15
    Character
    Telana Himura
    World
    Zodiark
    Main Class
    Paladin Lv 41
    Quote Originally Posted by caffe_macchiato View Post
    Many websites and games have it way worse and they never get free game time, like WoW.
    Are we talking about the same WoW I’m thinking of? Holy hells, I played that game for 10 years, and there were numerous times when we received free game time due to the servers being unavailable for much longer than expected whatever the reason was for the outage.
    (7)

  10. #30
    Player
    Themarvin's Avatar
    Join Date
    Aug 2016
    Location
    Gridania
    Posts
    2,230
    Character
    Kurotora Iga
    World
    Zodiark
    Main Class
    Monk Lv 100
    1-2 days should suffice and also whenever it get to it, SE is NOT supposed to do this as no one can bar themself form DDoS.

    It is a part of the game running and using servers.
    (2)

Page 3 of 6 FirstFirst 1 2 3 4 5 ... LastLast