Hi! I am currently working on Resplendent Tools. Doing the 2 step macro I think many of us use, I sometimes have been getting Waste Not proc with 6 steps instead of 4 steps (which breaks the macro). I have seen it happen more frequently when working on the B and C steps. As a work around, I ended inserting a lonely Observe where I could, for which thankfully I had enough CP left. This allows me to somehow 'waste' those extra Waste Not steps, and try to resync my macro. Has anyone seen something similar with Waste Not? Thank you.