Considering they are already porting the existing content to 2.0 they are actually ahead of schedule, if you look at the roadmap 1.23 is the end of this client content before 2.0 the delay that exists between 1.23 and 2.0 was about 5 months and since they had a 4 month delay between 1.20 and 1.21 id say we are fine and not behind schedule at all. E3 in June for the new trailer, and 1.22 in May as expected 1.23 in July and 2.0 in Sept/Oct.