I wouldn't be surprised if it ended up being the 23rd. If not, then pretty sure on March 1st.

Either way, now that the server merge stuff is handled, and they've covered basically everything else regarding 1.21 via Topics, all that's left is the juicy stuff - and all they need for those is 2-3 days.