Quote Originally Posted by Shurrikhan View Post
And for this you lose the ability to queue, and Impact will typically be skipped over, straight to Jolt, if within a minimum wait period (1 second) of a previous command.
I tried it all the way to 70, works fine with macro, just grey out impact icon replacing jolt icon so you know that impact is been proc.