technically, it's 7 weeks from the 3 month mark, and 3 months being the expectation they set via previous patch cycles and interviews regarding Heavensward.
Currently, CAD is pretty weak (15 usd = 19.9 cad), so I am buying game cards ($35 for 60 days). Therefore, I am paying $28.50 during that 7 week time period. That time period which I prepaid with the expectation that I would have new content to play during this time (again this is an expectation that Yoshi himself set). Anyway, people pay for different aspects of it, but to me that's 30 bucks down the drain. I no longer wish to dish my money out for this game and will just stick to F2P and pay money for single player games like Fallout, Starcraft, Witcher, MGS etc.
I posted this on reddit, so just copy pasting here cuz lazy.
1. My understanding throughout this whole game was patches are on a 3 month window. So I was expecting 3.1 this week. Nov 10 is a 7 week delay. However, maybe I've been wrong that 3 months is the expectation they set? The 3 month cycle was actually referred to in an interview about Heavensward back in February iirc.
2. In another interview some time ago, Yoshi said 2.0 was to set the basics and 3.0 would expand and spice things up. Nothing in the preview, nor the expansion itself, changed anything or added any sort of flavour. It's essentially a rehash of 2.x in a different locale.
3. I feel that FFXIV feels like a F2P game tbh, but has an amazing story that I was paying $45 per update. That's a lot per patch of story content, but I figured I got other things out of it too. I'm not paying $75 + cost of heavensward for a content update, just because they took a vacation.
4. Never seen a business let an entire team take a vacation at the same time? Also never seen a business let their team delay major releases of things for a vacation. If I just up and left for 2 months and said, hey this report you wanted this week.. well it will be there in November, because I am going on vacation with the rest of my department.
5. Also, I would not have minded if they said a few months ago. 'Oh, btw, our next patch will be delayed by 2 months due to us taking a much needed vacation after the Heavensward launch." They could have said that when Savage launched at the least. Instead they say it now. Half way through a 60 day time card that imo has gone to waste.
Anyway, I am not raging. I've just already cancelled my sub renewal and plan to tell my static that I am done tonight.