There was a bug before that counted SMN and SCH as the same when it counted LB generation.

Couple of nights ago we ran A2(S) with an AST stand in for our static SCH and at last phase had LB2. Whereas tonight with SCH back we werent getting close to LB2.

Anyone else noticed slower LB generation with SCH+SMN again?