Quote Originally Posted by darkstarpoet1 View Post
they should be more worried about their bottom line profit and loss margin than their cost assessment. if they are worried about cost they should have taken their time to get things done right the first time. now they have 2 choices. fix it no matter the cost or shut it down.
So they shouldn't calculate how much all of this is going to cost? That doesn't mean they aren't willing to spend. They simply need to know how much they are spending at any given time. Have you ever worked for a company before?