    TEPCO says it has begun pulling 150MW from Hokkaido Electric Power to help the supply shortage in East Japan
    8 minutes ago via TweetDeck
    Shindo 3 quake: Ibaraki
    It was shallow (10km depth) M4.6 quake
    METI_JPN Radioactivity level by area (Mar. 21) is uploaded
    http://www.meti.go.jp/english/electr..._Factsheet.pdf
    (glanced at it--may be a good read. Appears to have info on other plants in the region)

    24 hours without a noticeable aftershock in Tokyo (>5.0). Life is getting back to normal.
    (0)
    Last edited by RAIST; 03-21-2011 at 11:10 PM.
    {DISCLAIMER} Posts may contain opinions based on personal experiences that are not be meant to be taken as facts. What may appear as fact with no source reference may be recollection of information with no source, and may be subject to scrutiny without source reference. Any debate over validity of said facts without source references may be considered conjecture of all parties in that debate. Player comments may not be the expressed position/consent of SE, their affiliates, or any employees of said organizations. Please take these posts with a grain of salt if you are offended by the views of the player and understand that opinions are like assholes... everyone has one, not everyone wants to hear it.

  2. #72
    Player Xeth's Avatar
    Join Date
    Mar 2011
    Location
    San d'Oria
    Posts
    64
    With TEPCO starting up the LNG stations yesterday, and pulling 150MW from Hokkaido Electric Power, it would be safe to say that Tokyo has sufficient power now, as they only need 34,000 at peak, before summer, then it's 36,500. But they are currently drawing 35,500 (+150 according to the Tweet), so I would assume it's all good... but who knows.
    (0)

  3. #73
    Player RAIST's Avatar
    Join Date
    Mar 2011
    Location
    Bastok
    Posts
    2,563
    japantimes Smoke seen rising up from building of No. 3 reactor of Fukushima Daiichi nuclear power plant (Kyodo)

    TEPCO To Resume Rolling Blackouts Except In Early Morning
    meh... two steps forward, one step back....
    (0)
    {DISCLAIMER} Posts may contain opinions based on personal experiences that are not be meant to be taken as facts. What may appear as fact with no source reference may be recollection of information with no source, and may be subject to scrutiny without source reference. Any debate over validity of said facts without source references may be considered conjecture of all parties in that debate. Player comments may not be the expressed position/consent of SE, their affiliates, or any employees of said organizations. Please take these posts with a grain of salt if you are offended by the views of the player and understand that opinions are like assholes... everyone has one, not everyone wants to hear it.

  4. #74
    Player RAIST's Avatar
    Join Date
    Mar 2011
    Location
    Bastok
    Posts
    2,563
    Tohoku EPCO keeps on powering households; 22,000 more since yesterday; 220k left

    And that's about it for today; Summing up on FNPP1 : Good that there is continuous progress, but situation remains pretty much unstable
    Kind of an odd blurb that I just heard in one news reel. Korean automaker (GM division??!) stated no shortage of supply of JP parts as of yet, but are concerned that shortage may soon come and prompt suspended production in international markets.
    (0)
    {DISCLAIMER} Posts may contain opinions based on personal experiences that are not be meant to be taken as facts. What may appear as fact with no source reference may be recollection of information with no source, and may be subject to scrutiny without source reference. Any debate over validity of said facts without source references may be considered conjecture of all parties in that debate. Player comments may not be the expressed position/consent of SE, their affiliates, or any employees of said organizations. Please take these posts with a grain of salt if you are offended by the views of the player and understand that opinions are like assholes... everyone has one, not everyone wants to hear it.

  5. #75
    Player
    Join Date
    Mar 2011
    Posts
    261
    My mother in-law went into work last night (Toyota Manufacturing in Woodstock, Ontario) & was told that production at the Japan plant will be resuming today. They also cut their power down same day as SE & on the 22nd will be resuming production again. So this is a good sign as to how their power is doing anyways.

    Have also read that other manufacturing plants are also returning to work on the 22nd.
    (0)
    NightDagger
    Server - Lakshmi

  6. #76
    Player RAIST's Avatar
    Join Date
    Mar 2011
    Location
    Bastok
    Posts
    2,563
    yeah... strarting to see more and more mentions of other companies cranking things up as well. Nissan and Sony getting things going again too, hope to be making cars before week's end:

    http://gantdaily.com/2011/03/21/niss...tion-in-japan/
    (0)
    {DISCLAIMER} Posts may contain opinions based on personal experiences that are not be meant to be taken as facts. What may appear as fact with no source reference may be recollection of information with no source, and may be subject to scrutiny without source reference. Any debate over validity of said facts without source references may be considered conjecture of all parties in that debate. Player comments may not be the expressed position/consent of SE, their affiliates, or any employees of said organizations. Please take these posts with a grain of salt if you are offended by the views of the player and understand that opinions are like assholes... everyone has one, not everyone wants to hear it.

  7. #77
    Player Ibiku's Avatar
    Join Date
    Mar 2011
    Posts
    6
    Character
    Ibiku
    World
    Asura
    Main Class
    SMN Lv 90
    I vote Raist to be a forum moderator cause hes doing an amazing job of keeping the masses informed. Better then our own media. RAIST have my babies =D
    (0)

  8. #78
    Player Komori's Avatar
    Join Date
    Mar 2011
    Posts
    521
    Character
    Komori
    World
    Bismarck
    Main Class
    WHM Lv 99
    Raist should have all female player's babies <3
    (0)

  9. #79
    Player Ibiku's Avatar
    Join Date
    Mar 2011
    Posts
    6
    Character
    Ibiku
    World
    Asura
    Main Class
    SMN Lv 90
    Komori you are genius! I say we seek him out and DEATH BY SNU SNU! =D
    (0)

  10. #80
    Player RAIST's Avatar
    Join Date
    Mar 2011
    Location
    Bastok
    Posts
    2,563
    /blush

    heheh.. SNU SNU!!! Man, I miss Futurama.

    Anyway.. a little recap from TEPCO's press release... was hoping for a press conference, but nothing yet:


    Press Release (Mar 21,2011)
    Plant Status of Fukushima Daini Nuclear Power Station (as of 9:00 pm March 21st)


    [No New Developments since 6:00 pm, 21st March]

    Unit Status
    1 · Reactor cold shutdown, stable water level, offsite power is
    available.
    · No cooling water is leaked to the reactor containment vessel.
    · Maintain average water temperature at 100°C in the pressure
    restraint.
    2 · Reactor cold shutdown, stable water level, offsite power is
    available.
    · No cooling water is leaked to the reactor containment vessel.
    · Maintain average water temperature at 100°C in the pressure
    restraint.
    3 · Reactor cold shutdown, stable water level, offsite power is
    available.
    · No cooling water is leaked to the reactor containment vessel.
    · Maintain average water temperature at 100°C in the pressure
    restraint.
    4 · Reactor cold shutdown, stable water level, offsite power is
    available.
    · No cooling water is leaked to the reactor containment vessel.
    · Maintain average water temperature at 100°C in the pressure
    restraint.

    other N.A.

    [The next information in regard to the plant is planned to be released
    at 9:00 am, 22nd March.]
    Guess they'll get better containment going once their replacement parts come in....which prompts a hearty WTF??!! They had to ORDER replacement parts...dind't have them on hand anywhere nearby.... DOH!!
    (0)
    Last edited by RAIST; 03-22-2011 at 01:00 AM.
    {DISCLAIMER} Posts may contain opinions based on personal experiences that are not be meant to be taken as facts. What may appear as fact with no source reference may be recollection of information with no source, and may be subject to scrutiny without source reference. Any debate over validity of said facts without source references may be considered conjecture of all parties in that debate. Player comments may not be the expressed position/consent of SE, their affiliates, or any employees of said organizations. Please take these posts with a grain of salt if you are offended by the views of the player and understand that opinions are like assholes... everyone has one, not everyone wants to hear it.