01.10 TEPCO have succeeded in connecting a new external power cable to units 1 and 2. They will undergo inspection today (20th) to check the pump and valves in order to ensure they function. TEPCO is also aiming to restore power to units 3-6 after March 20th. They are calling it their ‘trump card’ in the battle to cool the troubled reactors. However, it is still unknown whether or not the cooling systems can be restored due to the damage they have sustained from the seawater. NISA has said that after restoring power, work will first begin on the meters and gauges, followed by the reactor cooling system and finally the spent fuel pool cooling system.
not progressing as quickly as we had originally hoped, but progress is progress