Results 1 to 10 of 310

Hybrid View

  1. #1
    Player Haglaz's Avatar
    Join Date
    Mar 2011
    Posts
    47
    maybe i was thinking more of a sticky, then?
    (0)

  2. #2
    Player RAIST's Avatar
    Join Date
    Mar 2011
    Location
    Bastok
    Posts
    2,563
    01.10 TEPCO have succeeded in connecting a new external power cable to units 1 and 2. They will undergo inspection today (20th) to check the pump and valves in order to ensure they function. TEPCO is also aiming to restore power to units 3-6 after March 20th. They are calling it their ‘trump card’ in the battle to cool the troubled reactors. However, it is still unknown whether or not the cooling systems can be restored due to the damage they have sustained from the seawater. NISA has said that after restoring power, work will first begin on the meters and gauges, followed by the reactor cooling system and finally the spent fuel pool cooling system.
    not progressing as quickly as we had originally hoped, but progress is progress
    (0)
    {DISCLAIMER} Posts may contain opinions based on personal experiences that are not be meant to be taken as facts. What may appear as fact with no source reference may be recollection of information with no source, and may be subject to scrutiny without source reference. Any debate over validity of said facts without source references may be considered conjecture of all parties in that debate. Player comments may not be the expressed position/consent of SE, their affiliates, or any employees of said organizations. Please take these posts with a grain of salt if you are offended by the views of the player and understand that opinions are like assholes... everyone has one, not everyone wants to hear it.