i don't think its a matter of the severs been to big to move, there was the story on eve on line where the chief exc recounted a story about how they were moving offices in London, and 1 employee got the job to run the sever across the city in the back of a cab during 1 maintenance period. I think its more about having some place with the band width and power requirement set up ready to go.