GE had 3 truch-mounted turbine generators ready to go in Florida last night--were just waiting on air transport. 7 More are slated to go over shortly afterward. They can crank out up to roughly 60 MW each. So, combined, they will hopefully be able to replace the loss of the output of at least one reactor I think.. forget what each one was rated at. Bear in mind that these reactors only supplied like 30% of Tokyo's total power too, so once they can get the grid repairs done...hopefully this will knock out most if not all of the blackouts.

Not a perfect plan, and it will take time...but it's progress.

Raist